去查网 logo

earthwork造句

1. The soldiers threw up an earthwork.
士兵们赶造了一座土垒。

youdao

2. The earthwork was cast up in a few hours.
土方工程在几小时内就完成了。

youdao

3. Our company is an earthwork to do business!
我公司是一家以做土方工程的公司!

youdao

4. There are many algorithms of earthwork calculation.
土方量计算有多种算法。

youdao

5. Archaeologists have uncovered some ancient earthwork.
考古学家发现了一些古代的土建工程。

youdao

6. Square grid is a common method used to estimate earthwork quantity.
方格网法是工程土方量计算中应用最为普遍的一种方法。

youdao

7. Earthwork calculation is often encountered in building the water projects.
土方计算是工程中经常碰到的问题。

youdao

8. Stonehenge is believed to be a large earthwork constructed about 5000 years ago.
巨石阵无疑是5000年前的一项巨大的土木工程。

youdao

9. The boundary of earthwork excavation and the Triangle network can be reconstructed.
将其用于土方开挖边线处理,在此基础上重新构网。

youdao

10. To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts .
为了降低土方工程的费用,填方量应等于挖方量。

youdao

11. Deep-holed millisecond blasting is a fast construction method applied to large scale earthwork.
台阶深孔微差爆破是一种大规模、快速的土石方施工方法。

youdao

12. Every earthwork, building, road and hedge tells us something about lost places and forgotten times.
一个土木建筑,大厦,道路,围墙都会向我们揭示一些被人遗忘时代和地方。

youdao

13. Scope: Earthwork Construction Machinery Construction Earthwork Construction Machinery Construction.
经营范围:賨土石方工程机械施工。

youdao

14. Scope: Earthwork Construction Machinery Construction Earthwork Construction Machinery Construction.
经营范围:土石方工程机械施工。

youdao

15. To pipe installation is complete and experience the qualified, conducted only after backfill earthwork.
待涵管道安装完成并经验收合格后,方可进行土方回填。

youdao

16. This paper states some treatment methods and relevant precautions of groundwater in earthwork construction.
论述了在土方施工中几种地下水处理的方法及注意事项。

youdao

17. The earthwork is a fundamental issue of architecture, which involves how the architecture meets the ground.
基座是建筑学的一个基本问题,这涉及到建筑如何连接大地。

youdao

18. The formulas provided in this paper are also suitable for the computation of the earthwork volumes and profiles.
本文得到的公式同样适用于工程上的土方量及断面面积的计算。

youdao

19. The tree stood out as something special, and all who return will take notice, despite the absence of the earthwork.
尽管这棵树本来就很特别,但要是没有这个土方工程,人们也是很难注意到它的。

youdao

20. Construction work will involve site formation and earthwork excavation, which will necessitate the removal of spoil.
建筑工程包括地盘平整和挖掘土方工程。这些工程将有需要进行移除废土。

youdao

21. As important engineering machine, hydraulic excavator is widely used in earthwork construction and mine exploitation.
液压挖掘机作为重要的工程机械,广泛应用在各种土石方施工和矿山采掘业中。

youdao

22. Clean excavated material shall be used for land reclamation or earthwork where practicable and subject to approval by AA.
可行时,经aa批准,开垦土地或土方工程应使用干净的挖掘物。

youdao

23. Solving the smallest transportation question of excavation and fill actually is a question of earthwork balance adjustment.
挖方和填方的最小运输问题求解其实是一个土方平衡调配问题。

youdao

24. In this paper, using method of the least squares, optimized calculation of earthwork for leveling up construction site is discussed.
应用最小二乘法,研究了建筑场地平整土方量的优化计算,并以实例说明该法是实用可行的。

youdao

25. Therefore, how to prevent and control the shifting sand, is a technical key question, which should be solved in the sub-base earthwork.
为此如何防治流砂成为基坑土方施工需要解决的一个技术难题。

youdao

26. And analyzes the water conservancy project balanced deployment conditions features, and finally earthwork that balanced deployment method.
并且分析了水利工程土石方平衡调配特点,最后说明土方平衡调配方法。

youdao

27. Two main problems in embankment dam construction, earthwork allocation and construction organization plan, are analyzed firstly in this paper.
就土石坝施工中的土石方调配与坝体施工组织设计优选进行了讨论分析。

youdao

28. Subgrade earthwork and rockwork shall include: fill subgrade earthwork, cut subgrade, special subgrade treatment and other relevant activities.
路基土石方工程包括:填方路基、挖方路基和特殊路基处理及其有关的作业。

youdao

29. The article introduces in detail the gist and methods of the construction quality control in the roadbed earthwork of road work at the embankment top.
该文从堤顶道路路基土方工程各施工步骤着手,详细介绍了堤顶道路路基土方工程施工质量控制的要点与方法。

youdao

30. The article introduces in detail the gist and methods of the construction quality control in the roadbed earthwork of road work at the embankment top.
该文从堤顶道路路基土方工程各施工步骤着手,详细介绍了堤顶道路路基土方工程施工质量控制的要点与方法。

youdao

按拼音查造句

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号